Loading…
Loading…
13,542 results • Best match
Operation and Maintenance of Multi village water supply scheme to Yekkegondi and other 7 Villages in Channagiri Taluk, Davanagere District (5Years 2026-27,2027-28,2028-29,2029-30,2030-2031)
Operation and Maintenance of Multi village water supply scheme to Yekkegondi and other 7 Villages in Channagiri Taluk, Davanagere District (5Years 2026-27,2027-28,2028-29,2029-30,2030-2031)
Custom Bid for Services - Hiring the services of supply of packaged drinking water for different Production (Oil & Gas) installations or establishments and Workover Rig locations (In house) under Assam Field Similar Category Hiring of Packaged ... Drinking Water Bottle
Custom Bid for Services - Hiring the services of supply of packaged drinking water for different Production (Oil & Gas) installations or establishments and Workover Rig locations (In house) under Assam Field Similar Category Hiring of Packaged Drinking Water Bottle
REPAIR REPLACEMENT AND MAINT OF EXT WATER RISING SUPPLY LINE DOZING PLANTS SUBMERSIBLE PUMP SETS CENTRIFUGAL PUMP SETS STARTER PANELS AND CLEANING OF SUMP OH TANKS WITH CONNECTED ITEMS AT MIL STN DHRANGADHRA
M&L for cutting of Road/PCC path, hard standing depth not less than 60cm and width not less than 45cm for laying water supply pipe and making good the existing surface with PCC (1:2:4) type B-2 of 150mm thick complete all as specified and directed by Engr-in charge
CONSTRUCTION OF BALANCE WORK OF BPHU BUILDING AT CHC PALARI, DISTRICT-BAOLDABAZAR (C.G.) i/c INTERNAL WATER SUPPLY, SANITARY FITTING, ELECTRIFICATION WORK ETC.
REPAIR/ MAINT OF PLASTERING, FLOORING, PERIODICAL SERVICES, SANITARY FITTINGS AND MISC B/R WORKS TO WATER SUPPLY INSTALLATIONS UNDER GE (U) MEERUT CANTT.
Complete removing existing roof treatment any type and M & L for roof treatment with APP modified polymeric water proofing membrane,3mm thick having centre core not less than 100 micron high molecular... @ 0.40 kg/sqm with all overlaps including rendering 10 mm thick in CM 1:4 mixed with water proofing compound @ 3% by weight of cement complete all as specified and directed.
Restoration of Rising Main and distribution line from Suffa and Dabber etc. under water supply scheme Nah damaged due flash floods under SASCI.
Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 80 mm dia. G.I. pipes.