Loading…
Loading…
14,987 results • Best match
AR WORK FOR PROVIDING AND LAYING OF CPVC WATER SUPPLY LINE FROM BLOCK-3 SUMPWELL TO NEW FAMILY BLOCK NO.1 (N-1) AND (N-2), TRANSPORTATION OF GARBEGE MATERIAL AND OTHER REPAIR WORK AT MLA REST HOUSE BHOPAL.
AR WORK FOR PROVIDING AND LAYING OF CPVC WATER SUPPLY LINE FROM BLOCK-3 SUMPWELL TO NEW FAMILY BLOCK NO.1 (N-1) AND (N-2), TRANSPORTATION OF GARBEGE MATERIAL AND OTHER REPAIR WORK AT MLA REST HOUSE BHOPAL.
Strengthening of Water Supply (Re-Boring of Tubewell No.-1/57 at Sector-57, 2/60 at Sector-60, 1/1 at Sector-1, 1/120 at Sector-120, UGR F-block Sector-63) Noida.
Excavating trenches of required width for pipes, cables etc. including excavation for sockets, and dressing of sides, ramming of bottoms,... not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil as directed, within lead of 50 m. The ...
Construction of Boundary Wall at Head Work site of NASIPUR Water Supply Scheme under Ratua-II Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Reinforcement for reinforced work in all sorts of structures including distribution bars, stirrups, binders etc intial... drawing and direction.(Rate Analysis).(i) JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL (a) For works in foundation, basement and upto roof of ground floor/upto 4 m. (i) Tor steel/Mild Steeel.: For works in foundation, basement and upto roof of ground floor upto 4mtr.
Construction of Boundary Wall at Head Work site of BETAHAL Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Reinforcement for reinforced work in all sorts of structures including distribution bars, stirrups, binders etc intial... drawing and direction.(Rate Analysis).(i) JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL (a) For works in foundation, basement and upto roof of ground floor/upto 4 m. (i) Tor steel/Mild Steeel.: For works in foundation, basement and upto roof of ground floor upto 4mtr.
Construction of Boundary Wall at 3rd Tube well site of DEOTALA Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Reinforcement for reinforced work in all sorts of structures including distribution bars, stirrups, binders etc intial... drawing and direction.(Rate Analysis).(i) JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL (a) For works in foundation, basement and upto roof of ground floor/upto 4 m. (i) Tor steel/Mild Steeel.: For works in foundation, basement and upto roof of ground floor upto 4mtr.
Construction of Boundary Wall at Head Work site of SULTANNAGAR Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Reinforcement for reinforced work in all sorts of structures including distribution bars, stirrups, binders etc intial... drawing and direction.(Rate Analysis).(i) JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL (a) For works in foundation, basement and upto roof of ground floor/upto 4 m. (i) Tor steel/Mild Steeel.: For works in foundation, basement and upto roof of ground floor upto 4mtr.