Loading…
Loading…
15,421 results • Best match
Quality improvement of drinking water supply by way of construction of 06(six) Nos. of 2500 GPH capacity package type IRP in/c allied civil, mechanical, electrical works etc. complete in all respects at Teliamura R. D. Block
Providing, installation and commissioning of package type Iron Removal Plant comprising of Iron Removal Filter of dual media filter with anthracite coal, filter gravel,... arrangements, disinfection with sodium hypochlorite solution through metering pump, all necessary pipes for raw water collection, inter connecting all the chambers, delivery outlet of 150 mm dia alongwith ...
Construction of new boundary wall and demolishing of old boundary wall for Type-III and Type IV Campus at N-1, GST Colony, Aurangabad (MS). SH: Providing and fixing water storage tanks on terrace for Type III Quarters and providing and laying water ... water supply connection ...
Construction of 400 Bedded Boys Hostel Building at JIPMER Campus, Puducherry. (Civil Work): Building portion including internal water supply lines, Sanitary Installation, drainage, demolition of existing quarters & other development works. ... Passenger lift , ... Solar Water Heater, ... Road work and ... fencing work in ...
Construction of Administrative Block cum Provisioning Store (G plus 5) and Residential Building Type-VI/01 (G plus 1) for Frontier Hqrs, SSB, Ranidanga, Siliguri (W.B.) including water supply, sanitary installations, electrical installations, ... Development works .
Cleaning of existing road gullies and manhole/ inspection chamber for SWD from Junction No. 3 to Junction No. 33 U.T., Chandigarh under SDE Sew-1, Chandigarh (for the period of 03 months) (Ch. to 2215 (N.P) Urban Water Supply)
Part B Tool and Plants +Contractor Profit
TENDER -PERUMKADAVILA GP- 2026-27- 142/27- CONCRETE AND DRAINAGE CONSTRUCTION IN MARAYAMUTTOM PARAYKKAVILAKOM PULIKKOTTUKONAM ROAD
OD27671/2026-2027:Providing and laying Cement concrete pipe 400mm dia for carrying water on bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluing excavation protection work/ back filling concrete etc.