Loading…
Loading…
15,389 results • Best match
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS04344
Cross Drainage Works HUMPE PIPE CULVERT Earth work in excavation for structures as per drawing and Technical specification clause 305.1 including setting out…………with excavated material.
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS111021
Construction of Road from MRL03-Balizar Panartali Village Road including Cross-Drainage works and Routine Maintenance of the works for 5 years
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS05237
Reinforced Cement Concrete Pipe NP3 in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts as per design on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 [SOR 25-26] [item No.9.2] ii) 1000 mm dia
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS06593
Cross Drainage Works Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,... and backfilling with approved material. I Ordinary soil,A Manual Means,(I) Without dewatering,(i)upto 3 m depth [SOR-25-26][Item No. 11.1 (I)]
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS22808
Drainage spouts complete as per drawing and technical specifications Clause 1209 [SOR 25-26] [Item no. 12.10]
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS232085
Providing and laying reiforcemented cement concrete Pipe NP-3 1000mm dia for culverts on first class bedding of granular material in single row ...