Loading…
Loading…
15,314 results • Best match
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS232067
Providing and laying reiforcemented cement concrete Pipe NP-3 1000mm dia for culverts on first class bedding of granular material in single row ...
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS111018
Construction of Road from MRL26-Nichalamari to Malibari Satra including Cross-Drainage works and Routine Maintenance of the works for 5 years
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS17281
Cross Drainage Works : Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material [SOR 25-26] [item No. 9.1] (II) Ordinary rock (not requiring blasting) i. Upto 3 m depth
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS22789
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (B) 1000 mm dia [SOR 25-26] [item No. 9.3 (ii)]
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS05227
Reinforced Cement Concrete Pipe NP3 in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts as per design on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. ii) 1000 mm dia
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Package No. AS06585
Cross Drainage Works Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,... and backfilling with approved material. I Ordinary soil,A Manual Means,(I) Without dewatering,(i)upto 3 m depth [SOR-25-26][Item No. 11.1 (I)]