Loading…
Loading…
15,203 results • Best match
As refer boq
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil:
As refer boq
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site... using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement ,including ...
As refer boq
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. Ingratings, frames, guardbar, ladder, railings, brackets, gate sand similar works.
As refer boq
Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work, refilling.80mm (medium) dia GI pipe
Providing Sewerage Network along with House Sewer Connections at Left out areas of Nasib Nagar, Pamposh Colony and Adjoining areas of Jammu Contract No. SDJ/W/62/2026-27
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:25 meter beyond 1 m from cutting edge. All kinds of soil
Sewerage Projects in 44 ULBs under SBM 2.0 under the jurisdiction of Sangareddy, Rangareddy, Nizamabad and Mahabubnagar PH Divisions (Package-III) under LS contract system with Hybrid Annuity Model