Loading…
Loading…
15,375 results • Best match
Improvement of passage and drainage system near Ganesh Mandir at Ganesh Nagar in Beat No.152 chembur in M/West Ward.
Improvement of passage and drainage system near Ganesh Mandir at Ganesh Nagar in Beat No.152 chembur in M/West Ward
WORK 4 MOHALLA MEHANDITALA MEIN SONKAR BASTI MEIN RAJESH SONKAR KE MAKAN SE MAIN CHAIMBER TAK UNDER GROUND DRAINAGE NIRMAAN KARYA
Urgent repair of gutter and re-stating of damage trenches including cross drainage in various places at Gaowada in V.P. Assolda
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing a)All works upto plinth level.
SUPPLY AND FIXING OF HUME PIPES FOR DRAINAGE IN VARIOUS WARDS UNDER ZONE NO. 02, (PIECE WORK) REWA (M.P.) 2nd CALL.
SUPPLY AND FIXING OF HUME PIPES FOR DRAINAGE IN VARIOUS WARDS UNDER ZONE NO. 02, (PIECE WORK) REWA (M.P.)
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Grp. 32 (Package No. AS15684, AS15687, AS15704, AS15706)
Cross Drainage Works (1x 1000) Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.[SOR 25-26] [item No.11.1]I Ordinary soil ,Upto 3 m depth
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Grp. 49 (Package No. AS082019, AS082028, AS082034, AS082042)
Cross Drainage Works Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. [SOR 2025-26][Item No. 9.1 & 11.1 / I (i)]