Loading…
Loading…
15,540 results • Best match
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Grp. 48 (Package No. AS082021, AS082023, AS082026, AS082027, AS082030, AS082033, AS082038, AS082044, AS082047, AS082056)
Cross Drainage Works Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. [SOR 2025-26][Item No. 9.1 & 11.1 / I (i)]
Improvement of Pathway and Drainage system at Shanti niwas chawl, Singh estate road no.3. near Patil home, Beat no.26, Kandivali east in R South Ward
Improvement of Pathway and Drainage system at Shanti niwas chawl, Singh estate road no.3. near Patil home, Beat no.26, Kandivali east in R South Ward
SPL REPAIR TO CERTAIN BLDGS AT 19 ARTY BDE AND STN HQ BARAMULLA AND PROVN OF 269 MTR AREA DRAINAGE SYSTEM AT BARAMULLA UNDER GE 969 EWS
... around urinal back in cement; fixing automatic flushing cistern with brackets, flush pipe, grating and Union for discharge pipe. (Including of fixing supply pipe to flushing cistern, trap and waste pipe), complete all as specified and as directed.
Thorough overhauling, necessary repairing including replacement of damaged spares and testing of 2 nos. 5 ton capacity overhead crane at Ultadanga Strom and Ultadanga drainage pumping station.
Cost towards dismantling of the 120 feet M.S. chain having lifting hook along with load sprocket and shaft from the worm, housing along with all accessories.Viz load, sprocket, worm-shaft load, wheel with pin, lifting wheel, chain, guards, operating wheel, G.M. Roller with locking arrengement and hole.
Construction of drainage channel at Pond w no 3 , Pyt Dhok Khalsa, Block Bhalwal Brahmana under PRI Distt. capex budget for the year 2026-27 (Pyt Level)
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Improvements to drainage arrangements in existing subways at various location in VM -TPJ (main line), TJ-KIK, NMJ-MQ sections under ADEN/Central & ADEN/TJ sub- divisions.
Improvements to drainage arrangements at various existing subways 55A in NMJ-MQ &