Loading…
Loading…
15,519 results • Best match
Excavation laying Jointing and Testing of GI pipes of various dia at various RD Under Head-PDNA
Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where... out of a rock where blasting is prohibited and stacking the excavated earth up to all lifts, stacking the excavated soil up to all lead clear from the edge of excavation and then ...
laying fitting of pipes for newly established habitations colonies in areas of Wagoora Constituency from Buffer Stock
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil
Laying fitting of pipes for newly established habitations colonies in areas of Gulmarg Constituency from Buffer Stock.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil
Electrical work for : (A) Provision of cover shed with lighting arrangement at LHS 555 at KM 1101/5-7 between CHCR-SAL section under the jurisdiction of ADEN/Tr./NGP. (B) Provision of covershed with lighting arrangement at LHS no 547 at KM 1083/27-29 ... cross drainage under ... shed, drainage etc. ...
Supply of automatic water level controller and indicator for 5.5 HP pump.
Construction of 5 Nos RCC box bridges of Span size 3mx3m (tentative) at Km 33/180, 33/747, 34/390, 34/967, 35/479, along with Drainage (PIPAR-BILARA Section) and Protection work such as protection wall, Stone Pitching and other protection work at breaches locations in PPR-BARA section
... formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat... slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment ...
Imp. Dev. of back lane by pdg. RMC from H no.1 to 7, 8 to13, 38 to 42, 43 to 56, 57 to70, 71 to74, 103to 107, 108 to 119 and Side lane from H no.1 to 119 and drainage system at MP Block, Pitampura, ward no. 57/KPZ
Imp. Dev. of back lane by pdg. RMC from H no.1 to 7, 8 to13, 38 to 42, 43 to 56, 57 to70, 71 to74, 103to 107, 108 to 119 and Side lane from H no.1 to 119 and drainage system at MP Block, Pitampura, ward no. 57/KPZ