Loading…
Loading…
15,523 results • Best match
BOQ
Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge : Above 40 mm nominal bore
Construction of Central Office for Yamuna Expressway Industrial Development Authority at YEIDA Yamuna Expressway Industrial Development Authority GautamBudh Nagar.
... structural designing and commissioning of all required services (e.g. all fittings of plumbing, sanitary installations, drainage, electrical works etc.) by incorporating stipulated specifications and Design Basis Report (DBR) for Civil, ...
Replacement and Laying of Sewer Pipes Construction and Raising and repairing of sewer M.H. at ward No. 44,46,48,54,55 file No. 86/26X9/1. 2nd Call
Providing,Laying & Jointing of DWC (double wall corrugated) PE pipes of renowened duly tested inclusive of all cost of inspection charges, transportation charges, transit insurance, loading unloading and stacking at site/storeetc complete 200mm(internal dia)
Providing and laying of NP3 600mm dia pipes at Plot No.58 to 30 at CIE Gandhinagar, Medchal Malkajgiri Dist (Under IALA funds)
Engagement of tractor mounted water tankers on hire for supplying of domestic water at Bara Simra thakur and Mirdha line, Pramod and santlal line, Momim tola, Hijukita, Lakhinder Grp. and Harrakha village under Rajmahal for the period of 365 days.
Engagement of tractor mounted water tanker on hire for supply of water including hiring of tanker and running cost of tanker diesel, driver, khalasi, mobile etc. all complete.
CONSTRUCTION OF 1918 UNITS HAVING 35 SQ.MT. CARPTE AREA EWS HOUSES INCLUDING INTERNAL INFRASTRUCTURE & DEVELOPMENT WORK AT THE PLOT AT TP.75 (MUTHIYA-HANSPURA) FP.87 IN NORTH ZONE OF AHMEDABAD CITY
electrification, water supply, drainage, storm water