Loading…
Loading…
15,515 results • Best match
Operation and Maintenance of 27 MLD STP based on SBR Technology at Bukan Wala Road for the year 2026-27 for 08 Months (01.08.2026 to 31.03.2027)
OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANT OF 27 MLD Capacity at Bukan Wala Road at Moga for 08 Months period 01.08.2026 to 31.03.2027
DEVELPOMENT OF CITY CENTER AT KAVARATTI ISLAND LAKSHADWEEP
STP PLANT :-Supply, installation, testing & commissioning of Sewage Treatment Plant with all electromechanical equipments, interconnected piping, valves, pumps, instaruments, gauges, electrification like panel, starter, cabling, earthing, ...
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 15 UNDER BR II
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(III) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). (A) PVC Pipes(Dia) (k)150 mm
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 16 UNDER BR II
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(III) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). (A) PVC Pipes(Dia) (k)150 mm
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 19 UNDER BR II
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(III) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). (A) PVC Pipes(Dia) (k)150 mm
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 20 UNDER BR II
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(III) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). (A) PVC Pipes(Dia) (k)150 mm