Loading…
Loading…
15,939 results • Best match
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 20 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Tube Well No. 3 of Gun Sankrul Wate
Design, Supply, laying, fitting of pipeline from different unit to nearby Drain/ Water body/ Pond/ upto 100m. Length for proper disposal of backwash water. (Payment will be made as per actual length of executed works.)
Cleaning SWD manhole complete including disposal of malba within 5 km lead complete in all respect as per satisfaction of EIC at Sector 31, Panchkula Extension (A/mtc of PH services in Sector 23 to 28, 31 and 32 and sector 1 to 6, MDC, Panchkula)
Cleaning of sewerage / SWD manholes, including labour, extracting silt / mud and disposal of malba upto 5 km lead as desired by Engineer-in-charge complete in all respect as per entire satisfaction of EIC.
REPAIR OF PUMP CHAMBER OHSR WATER WORKS PIPE LINE LEAKAGES NEW AUTOMATED WATER CONTROLLER SLUICE VALVE REPAIR OF EXISTING CONNECTIONS NEW MACHINERY PANEL BOARD NEW SUBMERSIBLE CABLE COLUMN PIPE AND SOLAR PANEL ETC
(b) Affidavit/undertaking of not having been black-listed by any Govt./Semi Govt. Organization/Corporation at any stage and/or debarred by the department of Punjab PWD(B&R)/water supply & sanitation department.
REPAIR OF PUMP CHAMBER OHSR WATER WORKS PIPE LINE LEAKAGES NEW AUTOMATED WATER CONTROLLER SLUICE VALVE REPAIR OF EXISTING CONNECTIONS NEW MACHINERY PANEL BOARD NEW SUBMERSIBLE CABLE COLUMN PIPE AND SOLAR PANEL ETC
(b) Affidavit/undertaking of not having been black-listed by any Govt./Semi Govt. Organization/Corporation at any stage and/or debarred by the department of Punjab PWD(B&R)/water supply & sanitation department.
CONSTRUCTION OF AMMN LAB ALONGWITH ALLIED INFRA AT KITCHAMA UNDER GE 969 EWS
Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-II.
CONSTRUCTION OF SAMUDAIK SWACHALAY AT MAHDEVSAL MANDIR PARISHAR IN GOILKERA BLOCK
18.7 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.SOR item No. DSR 18.7