Loading…
Loading…
15,935 results • Best match
Construction of Drinking water tank at Puwar Gaon at Mul Sakyong- I, under Sakyong GP
PWD(WB)/SANITARY AND PLUMBING WORKS/Page-2/Item-1 Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union,... socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc.complete in all respect including cost of necessary ...
Augmentation of PNP Running Room by Constructing an additional Building Comprising of 12 New Rooms in the Existing Running Room in the Section of SSE(W)PNP under ADEN/PNP.
... Breakup for details. 1127677.75 (-) 11.54 997543.74 13 Description:- Chapter 16 (Road Work) Please see Item Breakup for details. 318914.55 (-) 11.54 282111.81 14 Description:- ...
REPAIR/MAINT/IMPROVEMENT OF VARIOUS TYPES OF PUMP SETS WITH ALLIED WORKS INCL MAINTENANCE OF SWIMMING POOL, DISTRIBUTION AND RISING MAINS AT AF STN SIRSA
Routine maintenance and operation of Central Reverse Osmosis (RO) Water Treatment and Purification Plant, skid mounted type, 5000 LPH capacity, including routine checking, operation, adjustment and maintenance of all plant components, controls and metering instruments such as voltmeter, ammeter, flow meter, ...
Operation and Maintenance of SCADA system at WTP Waluj and Jackwell Bramhagavhan.
Operation and Comprehensive maintenance AMC of SCADA system of WTP Waluj Centralized water supply scheme including Raw water pumping station at Bramhagavhan for period of one year
Revitalisation of Banabithi Eco-Park at Dhalabil G.P, Khowai
Providing and laying water proofing treatment on roofsof slabs by applying cement slurry mixed with waterproofing cement compound, as directed by Engineer-in-Charge and consisting of applying ...
REPAIRS TO SUB CENTER AT. P. H. SUB-CENTER SHILWANI TQ. DEGLOOR.
Providing and applying water proofing treatment using acrylic polymer modified cement based5 water proofing coating with fibre glass mesh mixing at the rate of powder to liquid (2:1) by weight covering 9 to 10 Square Metre /Kilogram with two coat using approved chemicals for