Loading…
Loading…
94,954 results • Best match
IMPROVEMENT OF UNFILTER WATER SUPPLY BY LAYING OF 150 MM DIA DI PIPE AT ZAKARIA ST IN WARD NO-43
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (ii) 20 mm dia. medium quality
Outsourcing the work of Maintenance and operation of sewage Treatment Plant at Bhjarjwanoo Sundernagar. (O/M of 1.00 MLD Capacity treatment plant).
Annual Maintenance and operation of sewage Treatment Plant at Bhjarjwanoo Sundernagar having 1.0 MLD capacity with deployment of manpower as per (detail annexed) for 24x7, O & M of STP and including applicable statutory and legal compliance of rules & law for operation and effluent disposal of STP. Detail of Required man power as per Annexure-I
(SH Providing, laying, jointing and testing of DI pipe, PVC pipe, other fitting and construction of brick manhole chambers and relaying paver blocks.)
Excavation in foundations, trenches etc.in all kind of soil in all leads and lifts such as pick work, jumper work in saturated/unsaturated soil including bailing out water, blasting work in hard/ soft rock or chiseling in hard/soft rock where blasting is prohibited in all lifts stacking the excavated earth not more than 3 mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths sides of each deposited layer by ramming and watering and then disposing of all surplus excavated earth foundations etc., consolidating as directed within all leads and lifts and handing over the useable materials available from excavation to department free of cost complete work with in all leads and lifts as per the entire satisfaction & direction of the Engineer-in-charge
Providing and Laying of Sewage disposal pipe line with connection of existing DJB Sewer line and water supply pipe line with connection of existing DJB water pipe line for Atal Asha Home Narela, Delhi-40
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 25 mm nominal dia Pipes
Laying of pipe line
Laying of DI pipe
eProcurement System Government of Haryana Created By: Sanjay Sharma Created Date/Time: 19-Dec-2025 04:57 PM Tender Title: KALSORA - Laying of D.I. Pi... Tender ID: 2025_HRY_485752_1