Loading…
Loading…
96,216 results • Best match
Design, Drawing, Const.Testing and Comm.of Sewerage System, 390 KLD Sewage Treatment Plant (STP) and 95 KLD Effluent Treatment Plant (ETP) for District Head Quarter Hospital in Baripada including Operation and Maint.for a period of Five Years
Construction of STP & ETP Designing, drawing, supplying, constructing, testing & commissioning of Effluent Treatment Plant (ETP) & Sewage Treatment Plant (STP) of required capacity and appropriate technology (MBBR / SBR / MBR) including all civil, electro-mechanical works, tertiary treatment system, automation etc all complete to achieve desired effluent quality as per NGT norms. (Excluding cost of SCADA system, PLC, plant room, chemical storage room, yard lighting, compound wall, external electrification, treated water storage sump and re-use/disposal arrangements) ETP- 95 KLD STP- 390 KLD
Design, construction, supply, installation and commissioning of Sewage Treatment plant as turnkey for the year of 2025
Design, construction,supply ,installation and commissioning of Sewage treatment plant Sequenced Batch Reactor technology with 16 KLPD capacity which includes primary treatment,secondary treatment,sludge handling system which includes screw press feed pump with standby, screw dosing system, filter feed pump with stand by,hypo dosing system ,Pressurised water filter, Activated carbon filter,UV system and treated water transfer pump with standby with necessary pipes and fittings for the land gardening with irrigation system as per G.O (3D) No.8 dated 10.08.2023 (GST Extra as Applicable & FOR Salem Dairy)
DPR FOR PROVIDING SEWERAGE NETWORK and SEWAGE TREATMENT PLANT OF 7.50 MLD
DPR FOR PROVIDING SEWERAGE NETWORK and SEWAGE TREATMENT PLANT OF 7.50 MLD
Shifting of 200kva Trabsformer of Lift Irrigation Scheme Gonipora Waripora under the Juridiction of KPDCL Division Handwara FY 2025
Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 9 Mtr Long (410-SP-33) with Planting depth of 1/6 th of the height of Poles as per REC standard.
GENERAL-Increasing the agricultural yield in Ward No.1 of Njeezhoor panchayath in Kaduthuruthy Constituency-Implementation of Lift irrigation system at Ch.800 of MVIP Karikode distributory canal-Lift irrigationGeneral Civil Work
22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineerin- charge. The product performance shall carry guarantee for 10 years against any leakage.For vertical surface two coats @0.70 kg per sqm