Loading…
Loading…
96,896 results • Best match
providing and laying water supply distribution pipe line in village Baskushla, zone-5, ward no.7 under Mc Manesar limit. REcall I
providing and laying of water supply distribution pipe line and sewer line in village Baskusla in zone-5 ward no.7 under Mc limit
Operation and Maintenance (Manpower) for Devalapur, Jalikoppa, Hosur-Vakkund, Mallur-Matolli Lift Irrigation Schemes under Malaprabha Project Zone for the year 2025-26
Operation and Maintenance (Manpower) for Devalapur, Jalikoppa, Hosur-Vakkund, Mallur-Matolli Lift Irrigation Schemes under Malaprabha Project Zone for the year 2025-26
Plumbing rectification and maintenance works
KIIFB UTILITY SHIFTING Pipe laying at the approach road of Konnekadavu bridge across in Mundrothuruth General Civil Work Pipe laying
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
Construction and CAMC of 3 nos. 100 KLD MBBR technology prefabricated Sewage Treatment Plant at IIM Udaipur
Operation and routine maintenance of 3 nos. Sewage Treatment Plant of capacity 100 KLD capacity each in two shift on all days of the week including Sunday & holidays by deploying following staff. Operation & maintenance includes monitoring and healthy working of the plant to ensure the treated effluent as per RSPCB norms, etc complete as reqd. (a) STP Operator - 2 Nos. (6.00AM to 2.00 PM & 2.00 PM to 10.00 PM)
Annual Plan-Poonjar Thekkekara Grama Panchayat 220/2023-24 Gray water treatment plan in Kaipally GLPS and Kunnonni HWLPS -Gray water treatment