Loading…
Loading…
99,145 results • Best match
Supply and erection of submersible pumping machinery, laying, jointing and testing of 80mm dia G.I. pipe (M) of Rising main for water supply schemes Jassur phase-2nd)
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; Experienced service provider; Under AMC and functional
Operation and Maintenance of Effluent/Sewage Treatment Plant | Billing:monthly | Amount:8965008
Upgradation of Water supply scheme Ellenabad Town. Providing and Laying of distribution pipe line in balance streets and Construction of 2 No. Bosting Station.
Operation and maintenance of complete scope of the DNIT and existing/ Proposed water treatment plant, S/S tank, CWT and raw water pumping stations all raw water pumping machinery, clear water pumping machinery, inlet channel, rising mains various sizes, at head works and all mechanical works, electrical works, civil structures complete in all respect and all other works contingent thereto. for 12 months during defect liability period after trial run period of 3 months and 5 years thereafter and all other works contingent thereto.
Annual Plan-2025-26 Pr no 227/25 Nandipulam Lift Irrigation Canal Extension Ward 19-In Varandarappilly GP-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Percentage Rate Contract for Providing Manpower for Operation and Maintenance of Civil, Electrical, Water Supply and Treatment Services etc., as required at IIITDM, Kancheepuram
Providing and laying of water supply ductile iron pipe line from PH 2 to PH 1 and D-1 class rest house
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.:All kinds of soil.