Loading…
Loading…
99,818 results • Best match
Repairing of Atchala (Water Roof treatment) at Panduk Badyakyakarpara
Contract No : Civil Works/WB/BDN/NIT/33/Aus-II/BDO/APAS/Booth-28/2025-26(2nd Call), Sl. No. 01
INSTALLATION OF ARSENIC FREE WATER TREATMENT PLANT AT SUBARNAPUR DASPARA-228
eProcurement System of Government of West Bengal Created By: Mritunjoy Barai Created Date/Time: 16-Dec-2025 02:28 PM Tender Title: INSTALLATION OF ARSENIC FREE WATER TREATMENT PLANT AT SUBARNAPUR DASPARA-228 Tender ID: 2025_ZPHD_947421_4
Construction of water treatment plant near Badsanagar Primary School at Badsanagar
eProcurement System of Government of West Bengal Created By: DEBASISH MUKHERJEE Created Date/Time: 28-Feb-2025 02:14 PM Tender Title: Construction of water treatment plant near Badsanagar Primary School at Badsanagar Tender ID: 2024_ZPHD_779163_13
Providing Grid Connected Roof Top Solar Power Plant without Battery Bank in Sewage Treatment Plant at Bhiwani.
32.70.3 Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency (d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (f) Lightning and surge voltage protection. (g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 3. Above 100 kWp and up to 500 Kwp [Through Rate]
Providing New borewell 2 Nos, Erection of 10 HP submersible motor, Panel Board, Column Pipe, 3 core 6 Sqmm Cable and Laying of 90mm HDPE pipe line works for Water Supply at Ward No. 05 RR Nagar, Velu Nagar, Karumariamman Layout in Hosur City Municipa
Laying water pipe line, seveer line and strom Sewerage in Bhai Mani Singh Nagar 25 Acre and rose Avenue 14.75 Acre
Laying water pipe line, seveer line and strom Sewerage in Bhai Mani Singh Nagar 25 Acre and rose Avenue 14.75 Acre