Loading…
Loading…
99,824 results • Best match
REPAIR, MAINTENANCE AND RENEWALS TO SEWAGE PUMP SETS, AIR BLOWERS, SEWAGE PIPE LINES, VALVES, ELECTRIC PANELS AND CONNECTED ACCESSORIES AND CLEANING OF SEWAGE SUMPS / TANKS AT VARIOUS SEWAGE TREATMENT PLANTS UNDER GE (UTILITY II) VISAKHAPATNAM
Material and labour for cleaning of Raw Sewage Collection Sump/ Equalization tank / Sludge Sump / Screen Chamber having depth up to 6.0 meters of various sizes / capacities / shapes at Sewage Treatment Plants loacted at Dolphin Hill, Naushakti Vihar, SVN Colony, Nirman Park and other adjascent areas by dewatering and pumping out existing accumulated raw sewage from the underground by deploying external non-clog sewage disposal pump sets, including diversion of sewage to the nearby STP and/or disposal through approved municipal sewage tankers, as required at site and/or as directed by the Engineer-in-Charge; draining, isolating, and ventilating the underground sump and carrying out complete cleaning by strictly following all applicable safety measures and confined space entry procedures; removal of accumulated sewage, sludge, grit, silt, scum, rags, and other debris from the sump bottom, walls, benches, channels, and inlet/outlet zones by manual and/or mechanical means, including scrapping and wire brushing as necessary; washing and high-pressure water jetting of all internal surfaces to remove adhered deposits, followed by disinfection and deodorization using approved chemicals and final rinsing with fresh water to render the sump clean, hygienic, and fit for operation; collection, loading, transportation, and disposal of all removed waste materials at approved disposal locations in compliance with local environmental and statutory regulations. The item shall include provision of all labour, supervision, pumps, tools and tackles, safety equipment, PPE, ventilation arrangements, disinfectants, transportation, and all incidental works, complete in all respects as specified and as directed by the Engineer-in-Charge. Note: Complete volume of each sump / tank shall be measured from top edge to the bottom level for the purpose of payment irrespective of the water / sewage / sludge level available in the sump at the time of cleaning.
Construction of a steel bridge at chainage 7660 M on the Bhoyare to Padsali canal under Krishna Marathwada Lift Irrigation Scheme No. 2, Stage No. 1.
Construction of a steel bridge at chainage 7660 M on the Bhoyare to Padsali canal under Krishna Marathwada Lift Irrigation Scheme No. 2, Stage No. 1. Note - Mentioned rates to be quoted are excluding GST, Royalty and Insurance
Construction of a steel bridge at chainage 15620 M on the Bhoyare to Padsali canal under Krishna Marathwada Lift Irrigation Scheme No. 2, Stage No. 1.
Construction of a steel bridge at chainage 15620 M on the Bhoyare to Padsali canal under Krishna Marathwada Lift Irrigation Scheme No. 2, Stage No. 1. Note - Mentioned rates to be quoted are excluding GST, Royalty and Insurance
WATER PROOFING TREATMENT WORK AT VARIOUS QUARTERS UNDER PALASIA SECTION INDORE
WATER PROOFING TREATMENT WORK AT VARIOUS QUARTERS UNDER PALASIA SECTION INDORE
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; SERVICE PROVIDER; Functional but outside AMC and Warranty
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; SERVICE PROVIDER; Functional but outside AMC and Warranty
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; AS PER ATC DOCUMENT; Under AMC and functional
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; AS PER ATC DOCUMENT; Under AMC and functional