Loading…
Loading…
99,824 results • Best match
Providing laying jointing and testing of GI pipe
Excavation in foundations, trenches etc.in earth work in all kind & upto all height stacking in excavate soil not more than 3mt clear from the edge of the excavation & then returning the stacked soil in 15cm layers, when required into plinths sides of foundatión etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-Charge with in all leads & lifts. Pick Jumper Work
NAGOTHANE(IPCL) INDUSTRIAL AREA...M and R to Water Supply Scheme for NIA... Providing and applying ACPRS protective treatment to PAC tanks at MIDC WTP Nagothane.
NAGOTHANE(IPCL) INDUSTRIAL AREA...M&R to Water Supply Scheme for NIA… Providing and applying ACPRS protective treatment to PAC tanks at MIDC WTP Nagothane.
Construction of Water Treatment Plant (Sajaldhara) at Sitanagar m More ID- 109245286
Construction of Water Treatment Plant (Sajaldhara) at Sitanagar m More ID - 109245286
Construction of Water Treatment Plant (Sajaldhara) at Dhanaipur Bathan More ID- 109245110
Construction of Water Treatment Plant (Sajaldhara) at Dhanaipur Bathan More ID - 109245110
Laying of Pipe line in Ward 28 and 60
Providing and erecting temporary baricadding at site as per direction Eng. Incharge during excavation and laying of pipe
Rectification work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil