Loading…
Loading…
1,01,198 results • Best match
REPAIR TO EXTERNAL WATER SUPPLY WORK INCL WATER TREATMENT PLANTS, PUMPS, REPAIR TO BORE WELL, VALVE CHAMBERS AND CLEANING OF OVERHEAD TANK, UG SUMPS INCL MAP PH-II AND OTHER LOC AT RASPUNJA AND REPAIR REPLACEMENT OF LT UG CABLE, FEEDER PILLAR BOXES A
Supply of laying UPVC pipe of pressure rating 10 KG per Sqcm of dia 20mm with all tube fitting (such is bend, elbow , tees, of medium grade, connector, caps, plug and union etc). Laying in trenches / duct /floor in also cutting pipes screwing and for making bend on pipeing as required after taking down old pipe complected all as specifeid and directed.
Annual Operation and Maintenance of 7.5 MGD capacity Mangal Pandey Water Treatment Plant including supply of labourers under North 24-Parganas Arsenic Area Water Supply Scheme, under North 24 Pgs. Water Supply Division-I, P.H.E.Dte. for 1 (one) year
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Sewage Treatment plant, EFFECTIVE MANAGEMENT OF EFFLUENT and SLUDGE IN ATP OF SSM.; AS PER SCOPE OF WORK
and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Sewage Treatment plant
Annual mtc estimate for Road,water supply, sewerage and storm water drainage sector 18 Rewari
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Annual mtc estimate for Road,water supply, sewerage and storm water drainage sector 19 Rewari
[17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in ...
05/2026-27
Construction of Sewage Treatment Plant 100 KLD (STP) With moter Pump for 24+96 Satna