Loading…
Loading…
1,01,452 results • Best match
ARC FOR PROVIDING LAYING AND JOINTING OF PIPE LINE UNDER SUB DN DOLI
... mtr below natural ground level in all type of soil under CC/BT roads and pulling HDPE pipes of dia up to 110 mm, which are available in the form of a coil including excavation, ...
Maintenance of 14 MGD and 15 MGD Water Treatment Plant at Angadpur for 24 months under DMC.
Maintenance of 14 MGD & 15 MGD Water Treatment Plant at Angadpur for 24 months under DMC. (Details BOQ is attached with NIT)
Supply and Laying of 110mm PVC Pipe, 100mm K9 DI Pipe ,100mm and 250mm Dia MJ Collar in Tholkappiyar Street, Girigori Street at Ward No.06 in TCMC
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers Sand, silt or other loose soil, wet sand or silt not under water light black cotton soil, sandy loam and ordinary soil.SS20B
OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANT, CAPACITY OF 125 MLD AT AVANIYAPURAM MADURAI, DURING THE PERIOD OF 12 MONTHS.
distill water coil - 2 Nos/Month (Testing)
Operation and Maintenance of Sewage Treatment Plant 16 MLD STP Capacity on SBR Technology at Jagraon for the year 2026-27 period 01.04.2026 to 31.03.2027
OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANT OF 16 MLD CAPACITY ON SBR TECHNOLOGY AT JAGRAON FOR THE YEAR 2026-27 PERIOD 01.04.2026 TO 31.03.2027
Operation and Maintenance of Sewage Treatment Plant 12 MLD STP Capacity on SBR Technology at Jagraon for the year 2026-27 period 01.04.2026 to 31.03.2027
OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANT OF 12 MLD CAPACITY ON SBR TECHNOLOGY AT JAGRAON FOR THE YEAR 2026-27 PERIOD 01.04.2026 TO 31.03.2027