Loading…
Loading…
1,01,322 results • Best match
Annual Operation and Comprehensive Maintenance Contract of 150 KLD Sewage Treatment Plant and 10 KLD Effluent Treatment Plant at TMH and 105 KLD Sewage Treatment Plant at Drs Quarters and Dharamshala, Haffkine, Parel
(SH-Laying , jointing and testing of GMS pipe Main Line to New OHSR in Choti Kutia dismantle Cement Concrete and Re-construction in distribution system) Under JS Sub Division Tahliwal (section Bathu) RD 0 to 1002 mtr
Excavation in foundations, trenches etc., in earth work. lift upto 1.5 metres stacking the excavated soil not more than 3 metres clear from the edge... into plinths sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts complete in all respect as per direction of the Engineer-in-charge.
DESIGN, CONSTRUCTION,SUPPLY, INSTALLATION AND COMMISSIONING OF PACKAGE TYPE SEWAGE TREATMENT PLANT (based on MBR technology) WITHIN POWER PLANT AREA OF BOKARO THERMAL POWER STATION ON EPC BASIS
Repairing leakage in 450 mm. dia DI Pipe at Old Calcutta Road by Mechanical Collar and Laying 100 mm. dia DI Pipe at Bagchipara
Drilling of 6 an half inches dia bore well, Supply, Delivery and erection of suitable submersible pump set, laying and jointing of HDPE pipe line work at: Shilpa Avenue Nandanvanam Park in Circle -52, Kukatpally, Kukatpally Zone, CMC
Please refer to BOQ
Relocation of 500/600/700 dia C.I pipes from water treatment plant nishat to site of work including and hire charges of hydra for sorting ,stacking and loading and unloading of pipe lengths , complete job .