Providing Water supply arrangements with Laying HDPE Pipe at Ward no.3 in Kombainagar in Tiruchengode Municipality.,
Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes.
MODERNIZATION OF RIGHT BANK CANAL OF BODALKASA TANK UNDER DHAPEWADA LIFT IRRIGATION SCHEME STAGE II
eProcurement System Government of Maharashtra Created By: Shrikant Maskawar Created Date/Time: 11-Mar-2026 11:16 AM Tender Title: MODERNIZATION OF RIGHT BANK CANAL OF BODALKASA TANK UNDER DHAPEWADA LIFT IRRIGATION SCHEME STAGE II Tender ID: 2026_CEWRD_1267108_1
INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR MAKHAN NAGAR TOWN. (2nd Call)
TENDER DOCUMENT FOR INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR BALAGHAT TOWN
Design, manufacture, supply, erection, testing and Commissioning of Earth-Mat for 33/6.6 KV switchyard And Permanent water supply arrangement to Earth Pits for Sihora Lift Irrigation Scheme Tal-Savner Dist- Nagpur
Design, manufacture, supply, erection, testing and Commissioning of Earth-Mat for 33/6.6 KV switchyard And Permanent water supply arrangement to Earth Pits for Sihora Lift Irrigation Scheme Tal-Savner Dist- Nagpur
Provision of OPVC Pipeline distribution network for supply of treated water to various industrial units from GIDC water treatment plant at Verna Industrial Estate.
Hydraulic testing of pipeline as per CLAUSE NO 6.4.4 of CPHEEO MANUAL on water supply and treatment, a to the required test pressure by providing all work force, materials, reciprocating pump, pressure gauge,including the cost of water required, maintaining the test pressure for a period of 24 hours from the time the pipe line has attained the test pressure for successful testing, as per the standards, and maintaining the records of hydraulic test as required as per the direction of the engineer in -charge For PVC/HDPE pipeline 63 mm to 110 mm OD