Loading…
Loading…
1,02,440 results • Best match
PROVIDING LAYING , JOINTING AND TESTING OF PIPE LINE AT VARIOUS SCHEMES UNDER PROJECT SUB. DIVISION JAISALMER
Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended up to date) with necessary jointing material like mechanical... release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by electro fusion welding method, including all taxes , transportation and freight charges, ...
Laying of HDPE Pipe Line Drain at Kabali Street Under Councillor Fund in Div177 Unit39 Zone13
Work Value
Remodeling / Rehabilitation for laying underground pipe line of watercourse at outlet RD 178400/L Sheranwali Disty.
[4.16.1.3]Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms,... not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : 1.3. Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm
Providing and Laying, Jointing 110 mm dia PVC pipe line at Ward no. 54, Asha Nagar
Earth work in excavation for pipe trench in all kinds of soil in areas including dressing, water-ringa and raming and disposal of excavation earth lead up to 50 meter sand lift u to 1-5 m, disposal earth to be leveled neatly dressed. All kinds of ordinary soil 150*0.9*0.8 = 108 18.2.1/227
Estimate for laying Under Ground Pipe Line of watercourse at outlet RD 31000/R Modakhera Minor
[4.16.1.3]Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, ...
Laying Work of RCC Hume Pipe Near Gulabi Bulding front of Vihay Tailor in ward70 Zone02
Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr.