Annaul Maintenance estimate for main water works in Sector-1, Rohtak for the year 2025-2026.
eProcurement System Government of Haryana Created By: Jagmal Kumar Created Date/Time: 19-Dec-2025 03:05 PM Tender Title: A/mtc of Water Treatment Pl... Tender ID: 2025_HBC_490066_1
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Residential; Sewage Treatment plant; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Residential; Sewage Treatment plant; Service Provider
Maintenance of Curti water treatment plant. Supply, Installation, Testing and commissioning of Air blower for 55 MLD water treatment plant at Curti.
Supply delivery and laying of HDPE Pipe For Salt water line at W.9 Suganyanagar Cross street Suriyampalayam in Tiruchengode Municipality.,
Laying of GI / HDPE Pipes and Specials to proper line and level including jointing but excluding cost of Pipes and jointing materials for plumbing works for providing water supply arrangements etc.,complete.
DNiT for Drilling of 01 Nos. shallow tubewell and laying of pipe line to connceting tubewell to main line in Village Zaibabad Kherli Distt. Palwal.
Providing and Lowering 225 mm outer dia UPVC pipe (10kg/CM2) duly ISI marked complete in all respect as per directions of Engineer-in-charge
Construction, testing and commissioning of water treatment plant 5.2 MLD in shape of Rapid Sand Filter bed and allied units District Mandi (HP)
Construction,testing and commissioning of water treatment plant 5.2 MLD in shape of Rapid Sand Filter bed and allied units :-The scope of work includes the construction of 5.2 MLD WTP capacity water treatment plant capable to treat the raw waterof the quality specified in the basic design data to produce clear water as per the requirements of CPHEEO manual on water supply and treatment and as specified in basic design data. The water treatment plant shall include the construction of inlet chamber, raw water tank, presettling tank, V-notch, Flash mixer, alum solution/mixing tanks and dosing arrangement, clari flocculator, settling tanks, rapid sand filters complete with back wash arrangement, clear water tank, complete disinfection arrangement with bleaching power, plant building( for housing chemical store cum dosing room, water testting laboratory cum attendent room(toilet), supply of laboratory requirement,Electro Mechanical equipments, piping, valves mechanical/ electrical equipment, electric wiring & panel boards, sanitation, interconnecting paths, site development upto a minimum of 3m from edge of battery limit of plant i/c retaining and breast walls and fencing.The firm shall submit the detailed hydraulic and structural design and drawings( 6 copies) for each component of treatment plant which shall be approved by the department before the work is started. The design/ drawings and bearing capacity of soil i/c detailed survey and investigation of the mechnical/ electrical equipment & wiring etc. along with manufacturers specificattion/ design also be submitted for approval by the department. On the completion of all civil, mechnical and electrical works the contractor shall test run the plant for three months (90 days ) before handing over the same to the department at the cost of the contractor. However, electrical chareges shall be borne by the department. During this period the contractor shall run the plant at full rated capacity and produce the resuslts specified in the NIT as per the CPHEEO standards in the presence of Engineer-in-Charge (Chapter 1 and data sheet No.1)