Loading…
Loading…
20,674 results • Latest
CONSTRUCTION OF BADMINTON COURT AT TAPKARA
Providing and fixing water closet squatting pan (Indian type W.C. pan ), 100mm sand cast Iron P or S trap, 10 litre low level P.V.C. flushing cistern (same colour) conforming to IS : 7231, with flush bend and other fittings and fixtures complete including cutting and making good the walls and floors wherever required : 18.1.3 White Orissa pattern W.C. pan of size 580x440 mm
Construction of Devarmal to Dholnar Road Length 3.00 Km.
Compacting Original Ground. (ii) Compacting Original Ground supporting bankment Loosening, leveling and compacting original ground to facilitate placement of first layer of embankment, rified to a depth of 150 mm, mixed with water at O.M.C. and n compacted by rolling so as to achieve minimum dry ity as given in table 300-2 for embankment construction.
CONSTRUCTION OF ROAD IMPROVEMENT AT JAKKASANDRA MURUDAR LAYOUT NEAR BY PONNAPPA HOME
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Construction of Interlocking Road at Gram panchyat Badhaiya Pradeep saroj house to dileep saroj house
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and cam
Laying of CC Road from Door no.5-15-70 to 5-15-52 in Durgadas gari veedhi in 15th ward of Tuni Municipality.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.etc., complete as per s.s and as directed by the departmental officer in charge of the work. but excluding seigneorage charges.
Constg. A F.P. Scheme at village Rupal (Nr.Farm of BharatsinhLalsinh Rahevar -S.N.284 & 285 )(70:30) Tal : HimatnagarDist.Sabarkantha.