Loading…
Loading…
155 results • Latest
Reliability improvement by means of repairs, restoration/ maintenance of signaling assets under the jurisdiction of SSE/Sig/DMV/IC.
Digging of 1.0 Meter deep and 0.3 Meter wide trenches In hard soils including hard rock and Soil mixed with ballast/Stone/Bricks, including clearing of roots of trees and bushes and temporary obstruction on the selected route back filling and ramming of the soil in trenches to 3 original level., as per technical specifications and cable route plan. Note: In case where digging of trench up to 1.0 Meter depth and 0.3 meter wide is not possible or bigger size trench is required to lay more cables or loose soil/ muck is encountered, the depth can be reduced / increased as per directions of the Engineer-in-charge of the works, the payment will be decreased/increased proportionate to the depth & width of excavation compared to 1.0 Meter deep and 0.3 Meter wide.
New Construction of Urban Haat at Deesa Dist : Banaskantha
suitable arrangement for water supply and plumbing system like Drainage Line , Rain Water line and supply line for Hot and Cold water
Building Work
10000556 Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200cfm/300psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories,tools and plant and consumables etc for lowering of 200mm dia PVC pipes for housing fitted with socket and with or without well screen as per tenecessity for soft,medium,hard and boulder formation (PVC casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and with drawing after completion of the tube well).(Icluding both LABOUR FOR DRILLING 200MM DIA UPTO 30 MTR. & LABOUR FOR DRILLING 150MM DIA FROM 30 MTR TO 150 MTR including all.) CONSIDER FOR 150 MTR DEPTH. Ground Floor
Site development, Swimming Pool -50x25m, 8 Lane 400M Synthetic Athletic Track, Sump and Pump room, Bore well, Security cabin, Toilet block, HT electrification, Electrification and Track and Field Equipment
22.26 Providing and applying of swellable type water stop tape, 19mm x 25mm thick in linear meter (expansive nature) for construction joints treatment of RCC structure such as raft slab, retaining walls, water storage tank and at the junctions of raft slab with the retaining walls etc.. After cleaning the surface, one coat of required primer for swellable water stop tape shall be applied throughout the length of the joint @3.78 litre per 240 running meter. Over the primed surface swellable type water stop tape shall be placed. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage.
Drilling of borewell along with all pipelines works to water supply for Power House, Dam and Switchyard
Bore well upto 90 meter depth: Boring/drilling bore well of required dia perfectly vertical to receive casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipments, tools, plants and machineries required for the job, all complete as per direction of Engineer–in-Charge, upto 90 metre depth below ground level. All types of soil upto 90 meter.150 mm dia
CONSTRUCTION OF 100 Bedded Rajkiya kalyan Hostel at Bodhagaya, Gaya
42 22.8 Providing and laying integral cement based water proofing treatment including prepatation of surface as required for treatment of roofs, balconies , terraces etc, consisting of following operations. (a) Applying and grouting a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with proprietary water -proofing compound cleaning the surface before treatment, (b) Laying cement concrete using broken bricks / brick bats 25 mm to 100 mm size with 50 % of cement mortar 1:5 (1 cement: 5 coarse sand ) admixed with proprietary water proofing compound conforming to IS : 2645 over 20 mm thick layer of cement mortar of mix 1:5 (1 cement: 5 coarse sand ) admixed with proprietary water froofing compound conforming to IS 2545 to reuired slope and treating similary the adjoining walls upto 300 mm height including rounding of junctions, or walls ad slabs. (c) After two days of proper curing applying a secoung coat of cement slurry admixed with proprietary water proofing compound conforming to IS : 2645. (d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement: 4 coarse sand ) admixed with proprietary water proofing compound conforming to IS : 2645 and finally finishing the surface with trowel with neat cement slurry and making of 300 x 300 mm square. (e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test, All above operations to be done in order and as directed and specifed by the Engineer-in-Charge. sqm 483.51 850.70 411,318.68 483.51 411319 0 0 0 0 0 0 0 0