Loading…
Loading…
9,975 results • Best match
Operation and Maintenance Of LAXMIPUR piped Water Supply Schemes in Kaliaganj Block of Uttar Dinajpur district Under Raiganj Division, PHE Dte
Operation & Maintenance Of LAXMIPUR piped Water Supply Schemes in Kaliaganj Block of Uttar Dinajpur district Under Raiganj Division,PHE Dte [for a Period of 12 (Twelve) Months]
Annual Maintenance of Drinking Water Supply Borewells in ward No 01 to 23 in Jigani TMC Limits
Annual Maintenance of Drinking Water Supply Borewells in ward No 01 to 23 in Jigani TMC Limits
REPAIR MAINT OF EXTERNAL WATER SUPPLY SYSTEM PUMPING NETWORK VALVES STARTER ELECTRIC SUPPLY POWER FACTOR CORRECTION AND CERTAIN MISC E/M WORKS AT AFS JALAHALLI
Material and labour for Attending day to day water supply service related complaints like choking of rising main pipes of buildings, blockage in control valves/ float valves/ pipe fittings, etc, applying necessary engineering efforts like dismantle of pipes and fittings to clean and remove blocking objects, descaling of pipes, re-fixing of pipes on wall, etc to restore the proper flow of water to service tanks all as specified and directed.
Repairing and renovation of existing rising main under Jamgram-Panuria water supply scheme under RCFA Division-I PHE Dte.
Repairing and renovation of existing rising main under Jamgram-Panuria water supply scheme under RCFA Division-I PHE Dte. (Including 18% GST & 1% Cess)
As per BOQ
Supplying, laying, jointing & testing Ductile iron Pipes ,special class – K 7 ISI marked (IS-8329-2000 Reaffirmed -2005 Eddition 4.1) suitable for push on joints supplied with rubber gaskets , with sockets and cement mortar lining and metallic zinc coating inside and with finishing layer of bitumenous paint outside , without polyethelene sleeves but including Push on joint supplied with EDPM rubber gasket conforming to IS 5382-1985(reaffirmed-2003) with dual hardness of type 2 (bulb) and type-5 (Heel) quality , laid in trenches all as specified and as directed complete of following size:Note: After laying u/m pipe line the contractor should check proper water supply through the Pipe line.Note: (i) During laying pipe line cutting existing road/path/culvert/pcc tile and floor will be repair by the contractor without any extra cost and make surface as previous.
Repair of electrical starter and cubical panel board of various Rural water supply scheme under sub division Tibbi
Repair of electrical starter and cubical panel board of various rural water supply scheme under sub division Tibbi