Loading…
Loading…
9,625 results • Best match
Canal Water Based Water Supply Project for Construction of 5.00 MLD Water Treatment Plant WTP and other related works including 5 years O and M Part 2 at Samrala Town District Ludhiana Punjab under AMRUT 2 Scheme
Canal Water based Water Supply Project for Construction of 5.0 MLD Water Treatment Plant and other related works including Operation and Maintenance for a period of 05 years (Part-2) and Supplying, Installation, Testing of Solar Panels including other required equipment as per Guidelines of Punjab Energy Development Agency (PEDA) over Raw Water S&S Tanks of Water Treatment Plants with Operation and Maintenance for a period of 07 years under AMRUT 2.0 Scheme Town name Rampura Phul
CERTAIN REPAIR TO WATER SUPPLY DISTRIBUTION LINES AND OTHER CONNECTED ITEMS AT MIL STN BHUJ AND GANDHIDHAM UNDER GE (A) BHUJ
Supply, laying, connecting, jointing and testing ductile iron pressure pipe of size 100 mm(4") inch dia , ISI marked suitable for "push on joints" in standard working lengths supplied with rubber gasket duly ISI marked for water supply, Class K-7 with socket and with cement mortar lining inside the metalic zinc coating with finishing layer of bituminious paint on outside the pipe complete all as specified & directed.
Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/Dugwell At Jambhali In G.P. Jambhali Tah. Armori Dist. Gadchiroli
Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/Dugwell At Jambhali In G.P. Jambhali Tah. Armori Dist. Gadchiroli
REPAIR/ MAINTENANCE OF EXTERNAL WATER SUPPLY, DISTRIBUTION LINES AND CERTAIN CONNECTED WORKS AT HWW AT DALHOUSIE CANTT UNDER AGE(I) DALHOUSIE
M&L for LED display glow sign PVC board for HEAD Water Works supply installtion and inside the borad moulded letter for writing 250/400mm hight illuminated after provide to power supply for the board and letters are display on the board for " WATER SUPPLY INSTALLATIONS AT HEAD WATER WORKS " on top of the board and ''AGE(I) DALHOUSIE'' at the bottom of the board with both side MES Logo on the board complete with fixing arrangement of the board in the gate coloums with suitable size Angle iron frame and should be fixed to the main gate of Electric sub staion yard on the top of two vertical coloums with complete grouting and fixing arrangement by using of anchor fastner including testing after fixing of glow sign board complete with PCC work complete all as specified and directed .
Annual work of Valve operation of water supply under sector-2 at STPS, Sarni for the year 2026-27
Engagement of semiskilled man for opertaion of CI & GI gate valve for colony water supply,operation of pumps tank filling round the clock etc. i/c providing all T& P safety appliance torch & other charges to carry out thw work as directed by Engineer-in-charge.(One job is equivalent to engagement of three labour per day)
COMPREHENSIVE REPAIR AND MAINT OF SUB MAIN WATER SUPPLY DISTRIBUTION SYSTEM AT MOUNT ABU UNDER AGE (I) UDAIPUR
Material and Labour for cutting existing road/hard standing 40 cm wide including necessary excavation and earth work for taking out/laying pipe and making good disturbed surfaces to match with existing complete all as specified and as directed.