Loading…
Loading…
9,336 results • Best match
Const. of C/R building, B/wall, Water supply arrangement and Other Misc. Civil works at 33 KV S/S Lalsot.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. (Concealed work including cutting chases and making good the walls etc.,) (A) 20mm nominal size. (2.38.2)
Restoration of Road of Kushida Water Supply Scheme under Harishchandrapur-I Block under Malda Division, PHE Dte. in the district of Malda.
Dismantling all type of plain cement concrete works, stacking serviceable materials of site and removing rubbish as directed within a lead of 75mtr. for laying all dia pipe line in ground floor, a) upto 150mm thick.
GENERAL-O and M-Water Supply Schemes- 2026-27-UWSS to Tirur-Mace- Hiring of Vehicle for departmental use at Kerala Water Authority, PH Sub Division, Tirur-General Civil Work
P-1Annual Maintenance of Water Supply Materials & Munirabad Jackwell to Filterbed Raising Line 600mm dia MS Pipe in Koppal CMC Limit.
P-1Annual Maintenance of Water Supply Materials & Munirabad Jackwell to Filterbed Raising Line 600mm dia MS Pipe in Koppal CMC Limit.
Operation Maintenance of CI /DI / HDPE / UPVC / AC /GI Rising Main Distribution System for Chandrapur Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.
Supplying, laying, fiting, fixing and jointing of UPVC pipes onforming to IS:4985-2000 with latest revision and amendments, if any, with ecessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing elephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as pplicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good uality/approved brand solvent cement (as per IS:14182-1994 cluding cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as equired at site by adopting suitable method so as to facilate the aintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with istribution pipes etc. all complete as per drawing direction and atisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to beproduced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list.iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate ofentire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (PHED SOR 2019, P-L.3-5, It-2(ii) ) (A) Pressure Rating : Class - III Laying of pipe line including cost of pipe & fittings/specials butexcluding cost of valves.
Providing necessary Man power for operation and maintenance of Sector No.1 to 13 tubewells and Sub Division office work for water supply in G.T.S.
and Sub Division office work for water supply in G.T.S.