Loading…
Loading…
9,462 results • Best match
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 45 m3hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at PARAMESWARPUR Water Supply Scheme o
Design, Supply, laying, fitting of pipeline from different unit to nearby Drain/ Water body/ Pond/ upto 100m. Length for proper disposal of backwash water. (Payment will be made as per actual length of executed works.)
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 30 m3hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Dakshin Mahendrapur Water Supply Sc
Design, Supply, laying, fitting of pipeline from different unit to nearby Drain/ Water body/ Pond/ upto 100m. Length for proper disposal of backwash water. (Payment will be made as per actual length of executed works.)
Providing necessary Man power for operation and maintenance of Charedi Head works for water supply in G.T.S. (Pump Operator/ Valve Operator/ Security Guard)
water supply in G.T.S. (Pump Operator/ Valve Operator/ Security Guard)
Engagement of Special Third Party Independent Techno Financial Auditor for Techno Financial Audit AMRUT 2.0 Completed Works under the jurisdiction of Punjab Water Supply and Sewerage Division No.1 Patiala.
PUNJAB WATER SUPPLY AND SEWERAGE BOARD, CHANDIGARH.
CMC of the existing STP/ETP, WTP and Water Supply System (including consumables, spares etc.) for Malda Medical College and Hospital in the district of Malda (2nd Call)
Comprehensive Operation & Maintenance (including all Consumables, Spares, Accessories) for the Water Treatment Plant including the Treated Water Supply System from bore well (including pumps & pile line) to the underground reservoir upto all overhead tanks at Malda Medical College & Hospital in the district of Malda.
Operation and Maintenance of borewell,water supply pumping and distribution pipe lines leakages, renewal, rewinding and re-erection of submersible motor and flushing in z3
Supply, delivery and fixing of the following ISI make water supply materials including all labour charges etc., complete