Loading…
Loading…
9,762 results • Best match
LAYING OF UNDERGROUND PIPE LINE FOR WATERCOURSE OF OUTLET RD 13999-L OF UCHA PIND MINOR VILLAGE MAULL DISTT. JALANDHAR/ KAPURTHALA
Lowering ,jointing of RCC NP-2 plain end pipes 400mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect
Providing Laying Jointing in trenches GI Pipe line of 80 mm dia from Jawahar Colony Bhattakuffar to Shandil Niwas Bhattakuffar Shimla
Providing Laying and jointing in trenches galvanised mild steel tube (Medium grade) of following diameters conforming to IS-1239 as specified below jointed with butt welding according to relevant BIS code 816-1969 including all short pieces bends,tee and other specials etc. made from parent tubes as applicable for the particular reach and of approved specifications as per site conditions including flushing, cleaning and hydraulic testing complete to the best satisfaction of the Engineer-in-charge. The laying of pipes should conform to BIS code 5822-1970 within all leads and lifts complete in all respect.
Comprehensive Operation, Preventive Maintenance & Repairs of all Civil Structures, Various type of Pipeline, Various type of Valves, Storage Structures,5 MLD Water Treatment Plant (With chemical charges)Machineries ,All Pumping Machineries for ... quantity supply of ... potable Water to ... in supplied water ... supplied water at ... raw water charges ...
for seven RWSS water supply scheme, including supply of
Restoration of 600mm dia RCC pipeline leakage at Ambedkar Nagar 1st Cross maintenance of water supply in Rayadurgam Municipality under General funds.
Restoration of 600mm dia RCC pipeline leakage at fort near teru bazar maintenance of water supply in Rayadurgam Municipality under General funds.
PLEASE REFER TO BOQ
Earthwork in excavation by manual means in trenches for a foundation, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All Kinds of Soil.