Loading…
Loading…
9,181 results • Best match
Construction of Boundary wall of 2nd Tube Well Site,Road restoration, Rectification of FHTC and Installation of Functional Household Tap Connection of JATRADANGA Piped Water Supply Scheme at Old Malda Dev. Block in the District Malda under Malda Divi
cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
MOEI and fans including RM of DG set water supply pumpset street lights etc at CCRI Kalavoor Alappuzha S.H Renovation to existing sheet roofed area for canteen and other miscellaneous electrical works
Augmentation work of OHR, Pump House and Boundary Wall of TALSUR Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. (3rd Call)
Augmentation work of OHR, Pump House and Boundary Wall of MIHAGHAT Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. (3rd Call)
Augmentation work of OHR, Pump House and Boundary Wall of Belungaon Water Supply Scheme at Chanchal-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Facility Management Services - LumpSum Based - Jambhora; Supply of 50 LPH RO with 40/80 ltr water cooler for no of qty 1; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Jambhora; Supply of 50 LPH RO with 40/80 ltr water cooler for no of qty 1; Consumables to be provided by service provider (inclusive in contract cost)