Loading…
Loading…
8,963 results • Best match
Formation of residential layout in Haragapurgad in RS no 335/A village in Hukkeri Taluka uder Budha Basav Ambedker Niveshan yojane.under H/A 4059-60-051-0-05-423-TSP for the Year 2025-26
... all types of soils cutting with machine cutter without damaging the other utilities and supplying and laying of MDPE pipe (PE80) -PN 12.5 manufactured in accordance with ISO 4427 - 1996 with minimum required ...
CA NO. GE AF NO.1 / GUR-40 / 2026-27 REPAIR/ MAINT OF SOLAR HEATERS, ELECTRIC GEYSERS AND OTHER CONNECTED ITEMS AT SEKHON VIHAR UNDER GE(AF) GURGAON NO 01
M&L for rectification of leakage from GI 20 mm size bore pipe line by cutting and removing old lengh of pipe, supply & fix new galvanised iron pipe 20 mm bore medium grade pipe for stopping the leakage by making welding/replacemnt of necessary fittings of the same after drain out water from pipeline including insertion of pipe length upto 01 RM
MAINT. OF W/S NETWORKS BY LEAK REPAIR ,CUTTING AND FLUSHING WITH ALLIED WORKS . AT DIFF. BYE LANE OF BAGHAJATIN J BLOCK SHIBAJI RD EXT. AND SURROUNDING AREA IN WD NO - 102 ,BR-XII.
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.3 Lead jointing to C.I pipes and specials with supply of lead and spun yarn all complete to make the joint water tight at required hydraulic ...
Construction of Market Shed With Toilet, Deep Boring, PCC Road And Solar Light In The Campus Of Agriculture Market, Sons Bazartand, Chanho, Ranchi
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal Work - Exposed on Wall
Formation of residential layout in Gumachanamardi village in RS no 224/1 in Hukkeri Taluka under Budha Basav Ambedker Niveshan yojane.Under H/A 4059-60-051-0-05-422-SCP for the Year 2025-26
... all types of soils cutting with machine cutter without damaging the other utilities and supplying and laying of MDPE pipe (PE80) -PN 12.5 manufactured in accordance with ISO 4427 - 1996 with minimum required ...
Design and Construction of Underground Section from Charbagh Metro Station to Chowk Metro Station Approx 6.70 km, Construction of 07 Underground Metro Stations including Civil Works for Phase 1B of Lucknow Metro Rail Project at Lucknow UP
Supply at the site of work of LT, XLPE insulated, armoured, Aluminium conductor cables as per IS-7098/Part-I /1988with up to date amendment & specified in the specifications of the sizes given below, laying of cables in RCC hume pipes 250/150mm dia with collars (RCC hume pipes confirming to ...