Loading…
Loading…
9,946 results • Best match
Special MR for Various Type of Residences Water
Providing and fixing 15 mm nominal dia Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. (DSR 18.7.1)
DNIT for Laying of balance connecting 100mm, 150mm and 200mm i/d D.I. Pipe in place of existing damaged/irreparable A.C. Pipe, Construction of Sluice Valve haudies in village Kulasi and all other works contingent thereto.
LAYING WORK OF WATER PIPE LINE 800MTR (DIA 300MM, 200MM, 150MM AND 100MM) DI-K7 FROM DIFFRENT PLACES IN BALUAWAVEER WARD IN KOTWALI WARD.
Dismantling of roads for laying of water pipe line including sorting out and stacking of serviceable materials and disposal of unservice-able materials up to a distance of 50 m. A) Stone road
Providing AND Laying of GI Pipe Line Fixing of Cistern Tank in Nagalakere Beside Tippu Sultan Masjid Fort in Ward No. 39 Ballari city
Providing AND Laying of GI Pipe Line Fixing of Cistern Tank in Nagalakere Beside Tippu Sultan Masjid Fort in Ward No. 39 Ballari city
2500-Metre Pipe Laying from Plant Main Gate to Township for Secondary Source of Drinking Water Line Erection Work at BRBCL Nabinagar (4X250MW)
Erection of drinking water line
O and M - Water Supply Schemes-Annual Maintenance of distribution system in RWSS to Kaviyoor - Kunnamthanam Grama panchayaths for the year 2026-27-Pipeline Work
100.47.1.3:Leak rectification work in 50mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.