Loading…
Loading…
9,896 results • Best match
MAINTENANCE OF EXISTING F.W. AND U.F.W. SUPPLY MAINS, OLD G.I. PIPE CHANGE ALONGWITH SOME OTHER ANCILLARY WORKS ALONG D.E.B. RD., TINA BAZAR, 49/5 K.M. SARANI AND OTHER AREAS IN WARD NO. 79.
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.3 Lead jointing to C.I pipes and specials with supply of lead and spun yarn all complete to make the joint water tight at required hydraulic ...
02 - Gulab ji ke Bhatte par Sunil Gwala ke makan se Keshuram Jaat ke makan tak Nali/Nala nirman and anya Repair karya Pratapgarh
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
nagar palika seema kshetre ke devi singh chhatri ke samne se hote huye aage ki or cc road nirman karya
... and ramming of bottoms, including getting out theexcavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitablesite ...
WORK NO 15
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.Depth upto 1.5 m
Refer to BOQ
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 1000 mm dia. R.C.C. pipe (laying by manual/mechanical means).
Permanent Restoration of Road from Dandote to Neeli Mittli
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.Non-pressure NP-3 class (Medium duty) R.C.C. pipe. complete 900mm dia. R.C.C. pipe (laying by manual/mechanical means.