Loading…
Loading…
9,924 results • Best match
Please refer to BOQ
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete Nonpressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe (laying by manual/mechanical means).
Please refer to BOQ
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete Nonpressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe (laying by manual/mechanical means).
Repair of damaged R Walls at various spots of Project Road of CHEP-I due to heavy rainfall of 26 08 2025 and 03 09 2025 including filling of potholes and Surface Dressing in stretches.
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. NP3 1200 mm dia. R.C.C. pipe (laying by manual/mechanical means)
Ward No. 47 Drain construction work on both sides of the road from Rajesh Ghate Ji house to Digamber Tent House
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
Construction of Interlocking Road and Drain Mehndi Walo house to Ramkishan Ji house and instreet of Talib Bhai, instreet of Chauthmal Ji, instreet of Ramchandra Ji, instreet of Pappu Ji, instreet of Satyanarayan Ji in Raja Colony Ward No. 54.
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
Work involving wire fencing, tin sheds, soil-filled partition walls, troughs, fodder mangers, and pole shifting.
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...