Loading…
Loading…
10,026 results • Best match
Construction of road from FP School Chatyar to Chatyar Gai via Mohalla Om Prakesh Dutta
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.complete. Non- pressure NP-3 Class ( Medium duty ) R.C.C. Pipes )1000 mm dia. R.C.C. pipe (laying by manual/mechanical means) complete job
Contraction of Interlocking Road from Aslam kuresi house to sharwan tamkoria shop (chirawa road) at ward no. 23.
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
CONSTRUCTION OF VARIOUS WATERSHED DEVELOPMENT STRUCTURE IN MJSA 2.3 BLOCK SAM
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. (SAM BSR RD&PR 2026-27), 2A
Permanent Restoration of Road from Planghar Badhanoo to via Alidhara
41000 mm dia. R.C.C. pipe (laying by manual/mechanical means)
work no 3
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
ADDN/ALTN CUM SPECIAL REPAIR TO CERTAIN OTM ACCN AT MIL STN BD BARI UNDER GE KALUCHAK
S & F 15 mm bore Galvanized Steel tubes, medium grade for flush pipes, water supply pipes etc., fixed to walls and ceilings or laid in floors complete all as specified and as directed