Loading…
Loading…
9,978 results • Best match
Construction of road from Kallar to Sawani Rajouri 29.10 lacs Dassal Seiran to Tappa Mohalla by way of PHC and GSB Rs 19.98 lacs National Highway to Muradpur Bridge 7.75 lacs Muradpur Chowk to Chandwari. 19.40 lacs Nagrota Ziarat to Saran 24.06 lac
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.complete. Non- pressure NP-3 Class ( Medium duty ) R.C.C. Pipes )1000 mm dia. R.C.C. pipe (laying by manual/mechanical means) complete job
CONSTRUCTION OF 14MLD WTP WITH 5 YEARS OANDM AT DHURI NAME AS PER APPROVED DNIT
28.19 CONCEALED IN WALL: Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes as per IS 15778 (ISI marked with the prior approval of Engineer-inCharge), having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at ...
Renovation of 1 No Public Toilet Block near 20 and 30 Light Point Sector 30 Chandigarh Ch To Capital Head Civic Works Public Toilets
... rubber stopper (DSR No. 9.101.2)÷Providing and fixing grabe rail of stainless steel pipe 1.25" and fitting of grade AISI 304 as per JIS standard 3448 including fitting and fixing of pipe with clamps at 1.00 m spacing including cutting and making good the walls complete as ...
Construction of Pagawa to Jalke Approach Road Length 5.00 Km. (Actual Length 4.10 Km)(Deposit Work- without escalation and bonus)
Providing and laying Reinforced Cement Concrete pipe NP 3 /prestressed concrete pipe. (Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipes, excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) (B) 600 mm dia
CONSTRUCTION OF KHUTA TANGAR TO BHURSAKONA APPROACH ROAD LENGTH 1.44 K.M., BLOCK- BAGICHA DISTRICT- JASHPUR (C.G.)
PProviding and laying Reinforced Cement Concrete pipe NP 3 / prestressed concrete pipe. (Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipes, excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) B. 600 mm dia
CONSTRUCTION OF BADESAJAPALI TO KARRABHANIYADIPA TO HEDASPALI APPROACH ROAD,LENGTH 6.00 KM I/C. CULVERTS , AT DIST. MAHASAMUND. (MAHASAMUND DN.).
Providing and laying Reinforced Cement Concrete pipe NP 3 / prestressed concrete pipe. (Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipes, excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) 600 mm dia