Loading…
Loading…
57,413 results • Best match
Providing and Laying of PVC Pipe Line for Drinking Water at Village Randhawa Block and Distt Sri Muktsar SahibProviding and Laying of PVC Pipe Line for Drinking Water at Village Randhawa Block and Distt Sri Muktsar Sahib
Providing and Laying of PVC Pipe Line for drinking water at Village Randhawa Distt. Sri Muktsar Sahib.
Repair of the Drinking water pipeline and supplying Pipeline for water supply for garden maintenance, and repair work on the portion of the compound wall of the Inspection Bungalow at K.R.Pete Town, mandya District
Laying of RCC NP3 Pipe 1000 mm id in crossing under South Bypass Farm minor and Balsamand Hisar road with brick retaining wall both side of crossing and all other works contingent thereto.
HSR Items for DNIT Name : Laying of RCC NP3 Pipe 1000 mm id in crossing under South Bypass Farm minor and Balsamand Hisar road with brick retaining wall both side of crossing and all other works contingent thereto.
Extention of Existing Water Supply Pipeline in order to cover the uncovered area (1G,1H) in Ramdaspur I.E, Dist-Cuttack
eProcurement System Government of Odisha Created By: Sudarsan Behera Created Date/Time: 04-May-2026 01:16 PM Tender Title: Extention of Existing Water Supply Pipeline in order to cover the uncovered area (1G,1H) in Ramdaspur I.E, Dist-Cuttack Tender ID: 2026_IDCO_127602_1
Updating of Water works structure, Laying of 150mm i/d D.I Rising Main and laying of 100mm i/d distribution pipe line.
RAW WATER PUMP: Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked ` 2100 LPM x 12.00 M x 10.00 BHP
Laying of CPVC Pipe Line in Pocket-K Sarita Vihar in Ward No. 187, Central Zone
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 18.9.5 40 mm nominal dia Pipes