Loading…
Loading…
57,695 results • Best match
PROVIDING AND LAYING OF DI PIPE FOR WATER DISTRIBUTION IN MUGAL CANAL PHASE-II (Recall)
Making inter connection of proposed pipe line with existing pipe line of DI/CI including excavation dewatering etc. complete in all respect as directed by Engineer-in-charge for following dia. (i) 80-200 mm dia meter proposed pipe line.
Laying of 200mm and 250mm dia D.I Pipe Line at Nehuru Colony, Ward No. - 11.
Laying of 200mm and 250mm dia D.I Pipe Line at Nehuru Colony, Ward No. - 11
Work of laying pipe line from the house of Naushad son of Irshad towards Afzal.
Making of ferrul connection in 50 to 200 mm dia distribution main with saddle piece, service convections, fittings, and fixing lof brass ferrule of 15mm size including tapping the main and cost of bailing out of water The above work includes necessary dismantling and reinstatement of CC/Bituminous/BOE/CC Files/Kuccha road,excavation including stacking of servecable materials and disposal of unservicable materials with in municipal/village habitation limits as per direction of E/I. its also includes supply, carting, laying and jointing/fitting of 2.50m (PE-80,PN-12.50)20MM DIA (od) hdpe PIPE 5.50M G.1. Pipe medium quality, HDPE/G.I spacials & fittings as reqwuired to complete the work (for PVC/HDPE/DI/AC dia of existing pipe upto 200 mm) 1 No. HDPE adepter and 1 No. tap/stop cock 15 mm dia with 1 No. G.1. union along with all
PROVIDING AND LAYING OF DI PIPE FOR WATER DISTRIBUTION IN MUGAL CANAL PHASE-II (Recall)
Making inter connection of proposed pipe line with existing pipe line of DI/CI including excavation dewatering etc. complete in all respect as directed by Engineer-in-charge for following dia. (i) 80-200 mm dia meter proposed pipe line.
(SH. Laying jointing and testing of GI pipe for distribution system of various dia meter).
Excavation in foundation, trenches etc. in earthwork in all kind of soil such as pick work, jumper work blasting hard or soft soil, lift up to 1.50 mtr. Stacking the excavated soil not more than 3 mtr. Clear from the edge of the excavation and then returning the stacked soil in 15 cm layers, when required in to plinth side of foundation etc. consolidating each deposited layer by ramming watering and then disposing of all surplus excavated earth as directed with in a lead of 20 mtrs and as per entire satisfaction of Engineer-in-Charge.
Providing, laying and jointing of GI pipe of 80mm dia for rising main from RD
Providing,Laying, welding and testing of ISI marked GMS steel tube plain ended in trenches of following dia as per IS 1239-2001 including jointing the pipe with butt welding at both ends according to relevant BIS stanards/approved specifications including manufacturing reducers/tapers all short pieces and bends as per site requirements and made from parent tubes ( to be measured and paid alongwith pipes) bends shall be manufactured in such a way that not more than 11 1/4 degree deflection is caused by a single cut and internal dia is not reduced including hydraulic testing to the entire satisfaction of engineer in charge.