Loading…
Loading…
57,461 results • Best match
Providing and laying 100mm dia of DI Pipe water supply line from H. No. 419-385, 562, 610-619, 211-226, 528-544, 512-494 and 528-544 in sector - 28 in ward no. 27 Faridabad.
Providing and laying 100mm dia of DI Pipe water supply line from H. No. 419-385, 562, 610-619, 211-226, 528-544, 512-494 and 528-544 in sector - 28 in ward no. 27 Faridabad.
Sw - Wheel Valve Operation and Maintenance of water supply pipelines network as and when required under Sub Division No.III, Kalara, CD, APWD., Diglipur Period from May 2026 to October 2026
Supply of labour required for filter bed operation and wheel valve operation for distribution of water supply and day to day maintenance of water supply pipelines network system under the jurisdiction of Sub Division No.III, Kalara,CD, APWD., Diglipur.
Repairing leakage in 450 mm. dia DI Pipe at Old Calcutta Road by Mechanical Collar and Laying 100 mm. dia DI Pipe at Bagchipara
LAYING OF 110MM HDPE PIPE LINE FROM DHARAMPAL HOUSE TO REENU HOUSE IN WARD 1
Laying and Jointing PVC Pipe. Heading
Work of laying pipe line from Laksar Road to Tarachand house in Nagar Panchayat Bhokarheri
Making of ferrul connection in 50 to 200 mm dia distribution main with saddle piece, service convections, fittings, and fixing lof brass ferrule of 15mm size including tapping the main and cost of bailing out of water The above work includes necessary dismantling and reinstatement of CC/Bituminous/BOE/CC Files/Kuccha road,excavation including stacking of servecable materials and disposal of unservicable materials with in municipal/village habitation limits as per direction of E/I. its also includes supply, carting, laying and jointing/fitting of 2.50m (PE-80,PN-12.50)20MM DIA (od) hdpe PIPE 5.50M G.1. Pipe medium quality, HDPE/G.I spacials & fittings as reqwuired to complete the work (for PVC/HDPE/DI/AC dia of existing pipe upto 200 mm) 1 No. HDPE adepter and 1 No. tap/stop cock 15 mm dia with 1 No. G.1. union along with all
Providing laying jointing and testing of HDPE pipe of 25 mm dia SDF/2025/279
Excavation in foundation and trenches (For pipes and pits) up to all depths and in all classification of each work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling or wedging out of soft/ hard rock, where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring, strutting, planking, timbering and dewatering where ever required. Stacking usable and unusable material/ soil separately and after laying, jointing and testing of pipes, returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads/ lifts including restoration of unmetalled surfaces to its original condition and including cost of diversion for traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads and lifts as per direction of Engineer-in-Charge. (100% pick work)