Loading…
Loading…
75,765 results • Best match
Repair and maintenance of water supply pipelines in ward No.1-23 under Someshwara TMC limits for 2026-27
Repair and maintenance of water supply pipelines in ward No.1-23 under Someshwara TMC limits for 2026-27
Pipeline and running water supply by sinking and installation of solar submershible pump at Majura
... 11-Mar-2026 01:02 PM Tender Title: Pipeline and running water supply by sinking and installation ...
Replacement of damaged Feeder and distribution water supply main pipelines villankurichi in Ward No 9
Annual Operation maintenance of distribution system and rising main pipeline FHTC (CI/DI/UPVC) Hafania, Kankramari, Kishorpur, Mahesali , Keyadanga, Jogtai, Bazegazipur, Aurangabad Water Supply Scheme, water supply scheme Water Supply Scheme of
... Bazegazipur, Aurangabad Water Supply Scheme, water supply scheme Water Supply Scheme of Jangipur Sub-Division ...
Supply of 5 HP Submersible pump and motor and Extension of water supply pipeline at Dwarigeria Dkahsin Paschim
Supply of 5 HP Submersible pump & motor & Extension of water supply pipeline at Dwarigeria Dkahsin Paschim, Mouza- Dwarigeria, Jl No- 672, Plot No- 440
Laying of 100 mm dia water supply pipe line from H.No 18-8-303/2/3 to 18-8-297/58/1, 18-8-303/A/6/A to 18-8-303/25/A, 18-8-302/S to 18-8-303/A/19, 18-8-302/11 to 18-8-303/B/28 at Padmashali sangam, Tanaji nagar, Lalitha bagh ward under Balapur Section, Sub Division-II of O and M division-VIII
Providing GRP water tank and replacement of damaged water supply pipeline at AT 6 Boys Hostel, GU
M R for Various Type of Residences Water supply Pipeline and Drainage
... stability for hot & cold water supply, including all CPVC plain ...
Installation and interconnection of 5 inch diameter water supply HDPE pipeline on Karigundi Road.
Installation and interconnection of 5 inch diameter water supply HDPE pipeline on Karigundi Road.
RC Water Supply Schemes 2025 2026 TWSS MACE Annual maintenance of water supply distribution network Left side of Karamana Pipeline Work
100.9.2:Laying uPVC pipes of class 2 to class 6 and... solvent cement and testing the pipeline with water to the required test pressure ...