Loading…
Loading…
58,544 results • Best match
Construction of Watch Towers and laying of storm water pipe lines at Central Ridge forest near Vandematram Marg.
Providing push-on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and the cost of rubber gasket : 150 mm dia pipes
Construction work of gullypit and laying of water drainage pipe at various places under ward-49 zone-4.
eProcurement System Government of Uttar Pradesh Created By: Nanak Chand Created Date/Time: 26-Nov-2025 07:18 PM Tender Title: Construction work of gullypit and laying of water drainage pipe at various places under ward-49 zone-4. Tender ID: 2025_NNKAN_1085286_1
Laying of Riser Main pipe RD 1995 to 2475 along with distribution pipeline for Samrala Major Lift Scheme
Stringing out, cutting, Jointing and testing of ISI Marked D.I. Pipe (S&S) as per IS 8329 and laying the same in trenches to correct alignment and gradients, jointed with rubber tyton joints fitted complete including all cartage, cost of rubber ring. D.I. Pipe as per IS 8329 DI-K7 900mm i/d pipe lines laid complete
Providing and Laying of High-Density Polyethylene Pipe at college road in div 111 unit 24 zone 09
eProcurement System Government of Tamil Nadu Created By: Muthiah M Created Date/Time: 30-Jan-2026 04:10 PM Tender Title: Providing and Laying of High-Density Polyethylene Pipe at college road in div 111 unit 24 zone 09 Tender ID: 2026_CoC_646732_1
Dismantling, transporting, laying and jointing of 8/10 inch dia MS pipe at RVR-East of Kusmunda mines
Transportation, Laying, Welding and proper Matching of old or new 8"/10" dia M.S Pipes as per the instruction of Work incharge or Engineer Incharge which includes (A) Transportation of pipes 8"/10" from the workshop or any working sites as per the instruction of work incharge or Engineer incharge. (B) Laying and welding of pipes in proper position with earth work as per the ground profile at the working place. (C) Welding of pipes at the safe location as per the instruction of work incharge or Engineer Incharge for laying at high wall and across the road. (D) Laying, jointing and matching of welded pipes across the road and in high wall with the existing pipeline. (E) Matching of new pipelines with the existing pipelines as per the instruction of work incharge or Engineer incharge. NOTE: All tool and tackles , welding electrodes of required sizes, welding cutter, welding plant (minimum 20 KVA capacity DG set along with welding machine), cutting gases (DA Cylinder, Oxygen Cylinder), fuel and lubricating oil for welding plant etc. to be provided by the Contractor.
Waluj IA.Maintenance of Pipeline, Watch And Ward And repair works of water supply distribution system in Waluj Industrial Area for one year period.
DG - WALUJ INDUSTRIAL AREA...M&R to Centralized water supply scheme @ Waluj...Maintenance of Pipeline, Watch & Ward & repair works of water supply distribution system in Waluj Industrial Area for one year period.