Loading…
Loading…
60,742 results • Best match
Supplying and laying of 8 PVC Pipe in Ambal Avenue 2nd and 3rd Street and 12 PVC Pipe in Ambal Avenue 1st Street in Div-195, U-45, Zone-15
eProcurement System Government of Tamil Nadu Created By: TAMILSELVI P Created Date/Time: 24-Sep-2025 05:59 PM Tender Title: Supplying and laying of 8 PVC Pipe in Ambal Avenue 2nd and 3rd Street and 12 PVC Pipe in Ambal Avenue 1st Street in Div-195, U-45, Zone-15 Tender ID: 2025_CoC_605970_1
Laying water pipe line, seveer line and strom Sewerage in Bhai Mani Singh Nagar 25 Acre and rose Avenue 14.75 Acre
Laying water pipe line, seveer line and strom Sewerage in Bhai Mani Singh Nagar 25 Acre and rose Avenue 14.75 Acre
LAYING OF PVC PIPE LINE FOR 4NOS. STREET TAP AT BANAGRAM SINGHABAHINI DURGAMANDIR AND BADYAKARPARA,AC-277,BOOTH-59 W-35
eProcurement System of Government of West Bengal hosted at WB-SDC Created By: Sukanta Samanta Created Date/Time: 18-Feb-2026 02:04 PM Tender Title: LAYING OF PVC PIPE LINE FOR 4NOS. STREET TAP AT BANAGRAM SINGHABAHINI DURGAMANDIR AND BADYAKARPARA,AC-277,BOOTH-59 W-35 Tender ID: 2026_MAD_5011154_1
Providing and laying of DI Water supply pipeline in the streets of Durga Colony and Jagdish Nagar Ward No. 12 MC Panipat (Rural).
1.01 Making House water connection from water supply distribution system with GI pipe including Ferrule (12 mm), bends with safe access to the consumer including excavation and backfilling. BI01010001010000000000000515BI0100001113 [$-100009]0.00;\(0.00\) Each Excess(+) Full Conversion INR
BANDH PROVIDING AND INSTALLING 1 NO. ADDITIONAL DEEP TUBEWELL AND LAYING OF CONNECTING PIPE LINE AT VILLAGE BANDH DISTT. PANIPAT
BANDH `PROVIDING AND INSTALLING 1 NO. ADDITIONAL DEEP TUBEWELL AND LAYING OF CONNECTING PIPE LINE AT VILLAGE BANDH DISTT. PANIPAT
Laying of four (04) additional 10 inch dia pipeline ranges, diversion of existing nine (09) pipe line ranges from 6 no junction point to zero point near mega ramp and conversion of 6 inch pipe to 8 inch pipe of existing pipe ranges for dewatering of
Laying & fitting of 10" dia M.S. Pipes including aligning, surface leveling and supporting where ever required and jointing of pipes all complete in mines area as per direction of engineer in charge. (This includes manually handling/carrying of pipe to the required place upto 15 to 20 meters.)