Loading…
Loading…
60,908 results • Best match
LAYING AND INTERCONNECTION WORK OF 1000 MTR 10MM DIA HDPE PIPE LINE BUDDH VIHAR COLONY IN RAJA BAZAR WARD IN VARUNAPAAR ZONE.
Making new house connection with 20 mm HDPE pipe up to 5 m in length in 110 mm dia of HDPE distribution main including dismantling of road, excavation of earth supply, carting of specials lowering them into trenches, fixing them including bailing out water ...
C/O RCC Manhole chamber 3 Nos and Laying Jointing and Testing of DI pipe 150mm dia 60 Rmt at Do amb
Laying, jointing and testing in trenches centrifugally cast (spun) ductile iron pipes conforming to BIS 8329-2000 (latest with up to date amendments) in a length of 5.50 meters ...
Laying of Gravity Main DI Pipe line along the existing AC pipeline for Part III Saleli Rehabilitation site Morlem in Sattari Taluka
Supplying at store or site of work including railway freight, carting, loading and unloading, stacking etc. Centrifugally cast, (spun) ductile iron pressure pipes (with socket/spigot ends) conforming to IS : 8329-2000 with cement mortar lining inside ...
Providing laying and jointing testing and comm. of GI/HDPE pipe line at Devnarayan hostel ras Paliyawas road near Gram Panchayat Paliyawas.
PHED BSR 2023/ 1.4.1.2/ Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended up to date) with necessary jointing material like mechanical... release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by electro fusion welding method, including all taxes , transportation and freight charges, ...
Extension of Pipeline from Arasur Sump to Reddiyarur Sump in Kambalapatti Combined Water Supply Scheme Kambalapatti Panchayat in Anaimalai block of Coimbatore District under Union General fund -25.26
Extension of Pipeline from Arasur Sump to Reddiyarur Sump in Kambalapatti Combined Water Supply Scheme Kambalapatti Panchayat in Anaimalai block of Coimbatore District under Union General fund -25.26
Laying of transition pipe, tie-in and hook-up job of 18-inch HBPL with the existing HDD sections at four locations under ERPL Haldia
TRANSITION PIPE LAYING (>12 m length on both sides) of specified diameter: Laying of Owner-supplied pre-coated mild steel line pipes , including arranging all additional land/construction corridor, beyond Owner's ROW,... construction site, movement of construction equipment etc., receiving and taking over Owner-supplied materials, handling , transportation etc. from Owner's issue point to work site, stringing ...