Loading…
Loading…
61,765 results • Best match
LOHARI Providing and Installing 2 no deep tubewell against abandoned Quality affected and laying of connecting pipe line in village Lohari District Panipat
... the well site). ii) Measuring devices for time, discharge and V-Notch orifice method water level recorder (digital water meter recorder/ steel tape engraved). iii) The contractor shall collected water sample in the presence of SDE/JE. This water samples should be handed over to PHED for ...
Dismantling, Transporting, laying and jointing of 8in/10in dia pipe at heighwall area to sump at 1T patch ABOCP mine Block-II Area
eProcurement System of Coal India Limited Created By: NITIN KUMAR BAWAL Created Date/Time: 09-Sep-2025 05:52 PM Tender Title: Dismantling, Transporting, laying and jointing of 8in/10in dia pipe at heighwall area to sump at 1T patch ABOCP mine Block-II Area Tender ID: 2025_BCCL_342193_1
Restoration of road and Drain damage during laying pipe line at Borobari Road bye lane near Balak Sangha club at ward no-5
eProcurement System of Government of West Bengal Created By: PINAKI MAJUMDER Created Date/Time: 04-Jun-2026 05:34 PM Tender Title: PM/WATER/2025-26/18 SL-20 Tender ID: 2026_MAD_985847_20
Construction of UGR along with laying of M.S. pipe and Installation of Centrifugal Pump and Motor for Improvement of W/S System to AHPGIC Campus, Cuttack
eProcurement System Government of Odisha Created By: Biswaranjan Rath Created Date/Time: 21-Mar-2025 11:36 AM Tender Title: Construction of UGR along with laying of M.S. pipe and Installation of Centrifugal Pump and Motor for Improvement of W/S System to AHPGIC Campus, Cuttack Tender ID: 2025_WCUTT_110471_1
Laying of R.C.C hume pipe for cross drainage of storm water and cleaning of R.C.C hume pipe culverts and box culvert in different locations of mines at Balram OCP during monsoon 2026-27 under Hingula Area.
Carriage of Materials By Mechanical Transport including loading,unloading and stacking R.C.C. pipe, A.C. pipes, steel cylinder, R.C. pipes, S.C.I. pipes, C.I. pipes and unreinforced cement pipes 600, 700, 750 & 800 mm dia Lead - 5 km
Sinking a new tubewell including supply, erection and commissioning of submersible motor with pump set and providing, laying and interlinking 100 mm dia DI pipe with the existing pipe in Iyyanar koil OHT campus, Kompakkam, Puducherry.
Sinking a new tubewell including supply, erection & commissioning of submersible motor with pump set and providing, laying and interlinking 100 mm dia DI pipe with the existing pipe in Iyyanar koil OHT campus, Kompakkam, Puducherry.