Loading…
Loading…
62,186 results • Best match
INSTALLATION OF 1 NO. PVC TUBEM 150 MTR.WELL WITH PUMPING MACHINERY, CONSTRUCTION OF PUMP CHAMBER AND BOUNDARY WALL, LAYING OF D. I. PIPE LINE 100 MM
Const. of RMC Road and Providing and laying of 450mm RCC NP-3 PIPE from 612 to 591L Kanshi Nagar Ward No. 14 Ambala City (recall)
Const. of RMC Road and Providing and laying of 450mm RCC NP-3 PIPE from #612 to #591L Kanshi Nagar Ward No. 14 Ambala City
LAYING OF PIPE LINE AT WARD NO.41 OF ZONE IX-A (DEVI CHOUDHRANI ROAD AND NEARBY NARROW LANE) UNDER SILIGURI W/S DIVISION, P.H.E DTE
Providing and laying of RCC 350 and 450mm dia NP-3 Sewer pipe line in Indira Colony-1 in Ward no.14, Division-1B under MCG.
Providing and laying of RCC 350 and 450mm dia NP-3 Sewer pipe line in Indira Colony-1 in Ward no.14, Division-1B under MCG.
Construction and Commissioning of 200mm dia tubewell and providing laying and jointing of pipe line at village Chawanheri Nathu, Balai Ki Jhopriya, Block - Sultanpur, District Kota
... 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and ...
NAULTHA ROUGH COST ESTIMATE FOR PROV. and INSTALLING 1 NO. DEEP TUBEWELL AGAINST ABANDONED TUBEWELL AND LAYING OF CONNECTING PIPE LINE IN VILLAGE NAULTHA DISTRICT PANIPAT
... the well site). ii) Measuring devices for time, discharge and V-Notch orifice method water level recorder (digital water meter recorder/ steel tape engraved). iii) The contractor shall collected water sample in the presence of SDE/JE. This water samples should be handed over to PHED for ...