Loading…
Loading…
61,939 results • Best match
INSTALLATION OF 1 NO. PVC TUBEWELL WITH PUMPING MACHINERY, CONSTRUCTION OF PUMP CHAMBER AND BOUNDARY WALL, LAYING OF D.I. PIPE LINE, RISING MAIN 150 MM I/D
Providing and laying interlock tile and pvc pipe road gully chamber in st.bnl road near luminous ieltscentre and janta hair dresser st and adj,ward no.11
Providing and laying interlock tile and pvc pipe road gully chamber in st.bnl road near luminous ieltscentre and janta hair dresser st and adj,ward no.11
Supply and laying 110mm HDPE pipe line 390 mtr in mohalla sarairafi ward no 25 from main road to kabristan and aale hasan, Rooppur walo to Abrar
Carting from the store the following sizes of HDPE pipe and specials to the site of work lowering them in to trenches and laying true to alignment and gradient including jointing, testing of pipeline and including supply of jointing material such as nut & bolts, rubber insertion, white lead etc. com- plate but excluding cost of trenching and cutting of pipes etc. For making of lengths but including making joints.
Construction of various Streets and providing and laying pvc pipe road gully chamber in preetvihar Rinku st,Ap enclave st. main st and adj. ward no.10
Providing and laying of RCC NP-2 300mm 12 inch i/d pipe line and upgradation of existing SWD system at various locations in Sector-30, Chandigarh
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete :300 mm dia. R.C.C. pipe (DSR No.19.6.4)
Construction of left over internal streets by levelling and laying 80MM thick paver block at Gawala Colony and G.I. pipe railing in booth market Maloya Colony, Chandigarh.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and ...